论文部分内容阅读
针对万家寨二期上游围堰施工情况和存在问题的分析, 并根据工程实际提出了万家寨水利枢纽二期围堰的最佳断面型式, 以供今后围堰断面选型中参考。
According to the analysis of the construction conditions and existing problems of the upstream cofferdam in Wanjiazhai Phase II, the best section type of the second phase cofferdam of Wanjiazhai Water Control Project is proposed according to the engineering practice for reference in the selection of cofferdam section in the future.