钻井事故、复杂情况分析自1983年1月硐西1井开钻以来,截至1997年10月底完成井29口,该区钻井技术指标与川东地区“八五”期间已钻的112口井平均技术指标统计相比,平均建井周期多80d,平均机械钻速为1.22m/h,较112口井机械钻速1.43m/h?
Drilling Accident and Complicated Situation Analysis Since the drilling of the borehole in West Jiangxi in January 1983, 29 wells have been completed by the end of October 1997. The drilling technical indicators of this area are in line with the average of 112 wells drilled during the “Eighth Five-Year Plan” period in eastern Sichuan Compared with the technical indicators, the average well-drilling cycle is 80d more and the average penetration rate is 1.22m / h, which is 1.43m / h higher than that of 112 wells.