水库移民安置妥善与否关系库区的长治久安和水电站的正常运行。介绍了乌江彭水水电站可行性研究阶段库区及占地区概况、处理标准及范围、实物指标、移民安置规划及移民安置规划特点等,并强调指出,针对上述特点,长江水利委员会设计院在业主和有关部门的积极支持、密切配合下,提出了既符合国家有关政策,又符合库区实际情况,业主及地方均较满意的规划设计成果。
Whether the relocation of reservoirs properly or not is related to the long-term peace and stability of the reservoir area and the normal operation of hydropower stations. This paper introduces the reservoir area and its area overview, treatment standards and scope, physical indicators, resettlement planning and resettlement planning features of Wujiang Pengshui hydropower station feasibility study stage, and emphasizes that in view of the above characteristics, the Yangtze River Water Resources Commission Design Institute in the owners With the active support of relevant departments and close coordination, the paper presents the results of planning and design that are both in line with relevant state policies and in line with the actual conditions in the reservoir area, and are more satisfactory to the owners and local governments.