论文部分内容阅读
详细介绍了电力系统农网通信在ADSS光缆敷设过程中的架设特点和前期准备工作,并提出了在光缆装卸、放线、紧线、接续,以及金具安装等方面应注意的一些问题,以引起在今后的光缆施工中的高度重视。
The erection characteristics and preparatory work of power system rural network communication in ADSS cable laying process are introduced in detail. Some problems that should be paid attention to in cable handling, pay-off line, tight line, connection and hardware installation are raised in order to cause In the future construction of optical cable attaches great importance.