一、最早建设水电站——石龙坝水电站,位于昆明市滇池出口的螳螂川上,于1912年4月建成,装机(2台)容量480千瓦; 二、最高水头水电站——盐水沟水电站,位于云南省会泽县以礼河盐水沟,设计水头589米,最大水头629米,装机(4台)容量14.4万千瓦; 三、首次利用地下水库发电水电站——六郎洞水电站,位于云南省开远市六郎洞河上,总库容8.24万立方米,装机(2台)容量2.5万千瓦; 四、首次利用最大天然湖泊水电站——西洱河梯
One, the earliest construction of hydropower station - Shilong dam hydropower station, located in Kunming Dianchi Lake export mantis Sichuan, completed in April 1912, installed capacity (2 units) capacity of 480 kilowatts; Second, the highest head hydropower station - salt ditch hydropower station, located in Yunnan The provincial capital Zexian to Lihe ditch, design head 589 meters, the maximum head 629 meters, installed capacity (4 units) capacity of 144,000 kilowatts; Third, the first use of the underground reservoir hydroelectric power station - Lalangdong Hydropower Station, located in Kaiyuan City, Dong River, the total storage capacity of 82,400 cubic meters, installed capacity (2 units) capacity of 25,000 kilowatts; Fourth, the first time to use the largest natural lake hydropower station - Xi Erhe ladder