论文部分内容阅读
河口村水库工程坝址的地形、地质条件及坝区筑坝材料具备修建碾压混凝土重力坝和混凝土面板堆石坝的条件。研究和论证结果表明,在河口村修筑碾压混凝土重力坝和混凝土面板坝技术上都是可行的,混凝土面板坝方案投资省,技术优势较明显。
The topography and geological conditions of the dam site of Hekou Village Reservoir and the dam construction materials have the conditions for construction of RCC gravity dam and concrete faced rockfill dam. The results of research and demonstration show that it is feasible to build RCC gravity dam and concrete dam in Hekou Village. The investment of concrete dam project is obvious, with obvious technical advantages.