论文部分内容阅读
深圳某地铁车站,地下二层,基坑开挖深16~17m,基坑围护结构采用1200人工挖孔桩(密排布置),桩长21m,基坑平面尺寸为19.1m×237.1m,开挖过程中采用600钢管对围护结构分层支撑。1地质状况地质报告表明,车站范围内地层从上至下主要为:(
Shenzhen subway station, the second basement, pit excavation depth 16 ~ 17m, foundation pit retaining structure using 1200 artificial digging pile (close arrangement), pile length 21m, foundation pit size of 19.1m × 237 .1 m, excavation process using 600 steel pipe support structure layered support. 1 Geological conditions Geological reports show that the stratigraphic strata from top to bottom are mainly: (