论文部分内容阅读
哲兹卡兹干为一大型的采矿冶金联合企业。所属地下矿山沿用房柱法开采缓倾斜矿体。自六十年代中期开始,先后在55、57和65号新矿井推广采用自行式无轨设备。七十年代初期,55号矿井采矿掌子工效达44吨/工班,沿用普通设备的矿井则仅为12~30吨/工班。本文着重论述了“东方”矿山57号矿井现行采矿工艺的存在问题,并围绕设备挖潜、提高劳动生产率,介绍了改革采矿工艺和作业组织,对区段房柱采矿法新方案进行试验的一些情况。
Zhezkaz dry as a large mining and metallurgical complex. The subordinate underground mines follow the method of housing and pillar mining with gently inclined ore body. Since the mid-1960s, self-propelled trackless equipment has been promoted in new mines 55, 57 and 65. In the early 1970s, the working efficiency of mining face 55 in No. 55 coal mine reached 44 tons / working class, while the mine with ordinary equipment was only 12-30 tons / work class. This article focuses on the existing problems of the existing mining technology in No. 57 Mine of Dongfang Mine. In addition, some problems such as equipment tapping into potential and improving labor productivity are introduced. Some cases of reforming mining technology and operation organization and experimenting on new method of mining section with column and column are introduced .