论文部分内容阅读
在旦架哨隧道施工中 ,进行了监控量测 ,经对量测数据分析处理 ,得出围岩的位移及应力变化规律 ,从而正确指导了施工。
During the construction of the Danfishao Tunnel, the monitoring measurement was conducted. After the measurement data were analyzed and processed, the displacement and stress variation of the surrounding rock were obtained, and the construction was correctly guided.