工程简介京广K643+304上下行桥横跨人民胜利渠,均为2孔20米上承钢梁,现4孔钢梁均已陈旧,根据铁路发展需要,现将2孔20米钢梁改建为13+16+13米预应力砼梁。 1.根据: TB 2092-89文件中规定,当采用新工艺进行试生产时,应进行此试验。 2.设备: 这套设备是由郑州桥隧工程段自制而成(见下图),现简述如下: 首先在梁的两端由上下45工钢及左右钢拉杆组成两封闭矩形,并将100工钢及待试验梁平行置入两矩形框内,100工钢在上,然后在100工钢与梁间设3个千斤顶,在梁下设3个百分表,用以测量梁加载后的挠度。
Project Description Beijing-Guangzhou K643 +304 tributary bridge across the triumph of people, are 2 holes 20 meters on the bearing steel beams, 4 holes are now obsolete steel beams, according to the needs of railway development, now 2 holes 20 meters steel beam reconstruction 13 + 16 + 13 meters prestressed concrete beams. 1. According to: TB 2092-89 document provides that when using the new process for trial production, this test should be carried out. 2. Equipment: This equipment is made by Zhengzhou bridge tunnel project made from (see below), are summarized as follows: First of all, at both ends of the beam by the upper and lower 45 steel and about the steel rod composed of two closed rectangles, and 100 steel and the beam to be tested parallel into the two rectangular box, 100 workers in the steel, and then in the 100 between the steel and the beam set up three jack, set up under the three dial indicator to measure the beam load Deflection.