【摘 要】
:
蒸汽发生器(SG)管板组件深孔钻是SG制造过程中的关键工艺,也一直是制造过程中的难点之一。三门核电厂AP1000机组SG管板较之二代加核电机组的管板厚度增加,管板钻孔难度也随之
论文部分内容阅读
蒸汽发生器(SG)管板组件深孔钻是SG制造过程中的关键工艺,也一直是制造过程中的难点之一。三门核电厂AP1000机组SG管板较之二代加核电机组的管板厚度增加,管板钻孔难度也随之增加。本文介绍了三门核电厂2号机组SG管板3个孔钻偏问题的处理,期望在后续SG制造过程中,能够从中吸取经验教训,避免类似问题的出现。
Steam generator (SG) tube plate assembly Deep hole drilling is a key process in the SG manufacturing process and has also been one of the manufacturing difficulties. Sanmen NPP AP1000 unit SG tube plate compared with the second generation plus nuclear power unit tube plate thickness increases, the difficulty of tube plate drilling also increases. This paper introduces the handling of the three holes boring and offsetting problem of SG tube plate of Unit 2 in Sanmen NPP. It is expected that during the subsequent manufacturing of SG, lessons can be drawn from this to avoid similar problems.
其他文献
针对核反应堆专设安全设施试验间隔期的优化,以传统的专设安全设施组成设备平均可用度模型为基础,提出采用较少假设近似并考虑设备在备用、试验和检修3阶段状态关联的可用度
以中国改进型压水堆1000 MW核电站(CPR1000)蒸汽发生器(SG)为对象,分析SG上部水平支承垫条产生热膨胀弯曲变形后间隙测量值与实际间隙值不一致的原因,给出垫条结构的改进措施
介绍反应堆冷却剂温度测量通道校准(TP RCP63)试验的内容,分析数字化技术对核电厂TP RCP63试验的影响,着重论述与模拟技术核电厂相比存在的变化与问题,并提出采用数字化技术
运用一种双分布函数多相格子Boltzmann模型,对几种气泡运动进行数值模拟,并分析了模型本身。指出在使用模型进行分析计时应注意的一些问题。进一步对气泡上升过程中流场压力
根据高压安注死管段内的热工水力特性,分析管道热疲劳发生的机理.提出大亚湾核电站和岭澳核电站一期高压安注死管段的改进方案,并对改进方案中的新增管线进行疲劳分析后可得,
采用计算流体力学(CFD)数值模拟与实际实验参数对比分析风冷系统冷却特性,评估风冷系统设计合理性并优化限值。结果表明,控制棒数量的增加,有利于风量分配的均匀化和风冷系统
针对秦山第二核电厂1、2号机组运行初期发生的主环路温度计的典型故障,通过对温度计进行解剖和材料分析、与其他核电厂对比分析、试验室和现场振动分析,确定主环路温度计的故
蒸汽发生器安全端焊缝为异种金属连接的窄焊缝结构形式,填充材料为镍基合金152/182(690材料),内部组织的各向异性严重,采用超声波检测时可能导致出现假信号,缺陷的定位误差增
从操纵员培训、任务类型和工作负荷3个方面,对比分析核电厂调峰任务与其他常规工况下操作任务存在的差异性.通过对比得出,调峰任务和常规工况下操作任务相比,操纵员心理负荷
针对高寒气候对安全壳打压试验可能造成的各种影响,从设计、设备、施工、调试等角度分析试验风险点并提出解决方案。主要解决的问题有:低温条件下试验载荷对安全壳附属部件的