尾矿坝复盖坝坡施工实现机械化

来源 :金属矿山 | 被引量 : 0次 | 上传用户:lisky
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
复盖尾矿坝坝体外坡是防止坡面受雨水冲刷拉沟破坏坝坡稳定和尾矿粉尘飞扬的重要措施.目前国内大部分选厂尾矿坝复盖坝坡施工方法为人工或小型机械施工.这对于坝体较长、复盖工程量大的尾矿坝,不但工期长,投资费用高,而且无法保证施工质量,影响了坝体的安全. 歪头山选厂自1981年起,复盖尾矿坝坝坡由人工改用机械化施工方法,取得了显著的经 Covering the outer slope of the tailings dam dam is an important measure to prevent the slopes from being damaged by stormwater flushing ditches and stabilizing the dam slope and flying tailings dust.At present, most of the tailings dam processing plant covers the dam slope construction methods for artificial or small Mechanical construction.This is a long dam, covering a large amount of engineering tailings dam, not only long construction period, high investment costs, and can not guarantee the construction quality, affecting the safety of the dam .Yuetoushan plant since 1981 , Cover the tailings dam slope by manual conversion mechanized construction methods, and achieved remarkable
其他文献
我省小型露天矿分布较广,矿种较多,目前主要由各地区、县、公社经营。普遍存在技术力量薄弱、矿山工作者缺乏必要的开采知识,对本矿矿量、服务年限、开采方法尚未掌握等问题
由于市场的高速变化,使得我们的研究和咨询也处在高速的应对过程当中,我一直有一个观点,就是中国的咨询业能够成为全球领先的一个行业,中国的企业在过去的10年当中一直是一个
在本文中以英古列茨采选公司为例,对一般工艺和间断-连续工艺运输矿石的技术经济数据进行了比较。克里沃罗格矿区英古列茨采选公司 In this paper, an example is the Anglo
姑山铁矿是马钢原料基地之一.姑山铁矿龙山选厂自1978年投产以来,经过一系列的工艺流程变革,采用了跳汰-螺旋溜槽-浮选联合流程,生产虽有所好转,但生产指标仍未达到设计要求
一座新型的铜—钼露天矿和一座日处理能力为44,000吨的选矿厂作为重点工程项目已在蒙古边远牧区额尔德内塔(Erdenet)建成。额尔德内塔位于蒙古乌兰巴托西北200英里处,距蒙苏
目前发现,不少4米和5米等大型绞车,由于对卷筒开裂故障处理不当,效果不好,已经成为响影生产的关键问题。现场往往是:只要发现卷筒某个部位出现裂纹,便对裂纹部位反复焊补,加
由昆明冶金设计研究院设计,于1982年建成的狮子山分矿竖井车场联动线日前正处于试生产阶段。这条竖井是我省第一条盲竖井,井径4.5米,井深272米。采用容积1.6米~3自卸式矿车,
用于防止运输机胶带纵向断裂以及避免由于停机和修理胶带所造成的经济损失,目前已有一些监测保护装置在使用。随着长距离、大型胶带运输机不断投入使用,胶带制造厂商们已着
哲兹卡兹干矿床的铜—铅矿石,共铜含量的90%左右以辉铜矿和斑铜矿两种矿物产出,这在世界上是独一无二的。在已知的矿床中,无论是苏联的、还是其他国家的,都还没有发现类似的
目的:通过对我院2002年11月-2008年8月的收入住院的烟雾病病人采用不同的治疗方法(内科保守治疗和外科手术治疗),并对这些烟雾病病人出院后进行长期的观察和随访,从而对外科