论文部分内容阅读
为了提高和发展斜井掘进机械化水平,加快斜井建设速度,根据煤炭部技术司关于斜井掘进机械化配套调研的要求,以陕西省煤炭科学研究所为主,有西安矿业学院、铜川煤炭基建公司和澄合矿务局等单位参加,组成了“岩石斜井掘进机械化配套”调研小组,于82年8月至9月,分别对华东、华北、东北、西北的11个省、20多个矿务局、基本建设和科研设计单位进行了调研,汇集了国内外岩石斜井掘进机械化现状,并进行了分析,初步提出了斜井掘进机械化配套意见。
In order to improve and develop the mechanized level of inclined shaft excavation and speed up the construction of inclined shaft, according to the requirements of the Technical Department of Coal Departments on the supporting survey of inclined shaft excavation mechanization, Shaanxi Institute of Coal Science is the main part. Xi’an Mining Institute, Tongchuan Coal Infrastructure Construction Company And Chengsong Mining Bureau and other units to participate in the formation of the “rock slope tunneling mechanization supporting ” research team from August to September in 82, respectively, to East China, North China, Northeast, Northwest 11 provinces, more than 20 A mining bureau, capital construction and scientific research and design institute conducted a survey, bringing together the status quo of mechanized rock tunneling at home and abroad and conducted an analysis of preliminary proposed inclined shaft tunneling mechanization supporting opinions.