论文部分内容阅读
储罐的施工,必须满足设计技术要求,搞好预制、组装、焊接、检测等各个环节,保证工程安全、可靠。一、工厂预制1.预制范围:为保证产品质量,凡可在工厂预制现场安装的,均应在预制厂预制。2.材料供应:要按设计料单进行供料。在订货前,必须考虑材料的质量、价格、交货期、施工场地以及材料到厂时间。必要时,在设计图纸完成前,就要对材料做些准备。到厂的材料,在加工前要对数量、尺寸、规格、型号以及材质等进行检查。3.工厂预制:储罐有各种形式,其中球形储罐和圆筒形储罐比较适合在工厂预制。这
Tank construction, must meet the design and technical requirements, improve prefabrication, assembly, welding, testing and other aspects, to ensure the safety and reliability of the project. First, the factory prefabricated 1. Prefabricated range: In order to ensure product quality, where the factory prefabrication site installation, should be prefabricated plant. 2. Material supply: According to the design bill of materials for feeding. Before ordering, you must consider the quality of the material, price, delivery time, construction site and material to plant time. When necessary, prepare the material before the design drawings are completed. To the factory materials, before processing to the number, size, size, type and material to be checked. 3. Factory prefabrication: There are various types of storage tanks, of which spherical tanks and cylindrical tanks are more suitable for prefabrication at the factory. This