碾压混凝土夏季高温施工是碾压混凝土施工的一大难题 ,为此 ,国内外科技人员开展了大量的试验研究工作 .通过反复试验研究证明 :采用低脆性及低水化热水泥 ,高掺粉煤灰 ,掺用高温型多功能缓凝高效减水剂 ,优化混凝土施工配合比 ,对仓面进行喷雾降温保湿 ,降低原材料储存温度 ,适当控制施工仓面 ,尽量缩短混凝土层间间隔时间 ,加强质量控制等一系列措施是实现夏季高温施工的必要技术措施 .这些措施已在大广坝、石板水、山口等电站的碾压混凝土高温施工实践中证明是可行的 ,值得推广应用
RCC construction in summer is a major challenge for roller compacted concrete construction.Therefore, a great deal of experimental work has been carried out by domestic and foreign scientists and technicians.Through repeated experiments and studies, it has been proved that the low-brittleness and low hydration heat cement, Coal ash, mixed with high-temperature multi-functional retarding superplasticizer, optimizing the mix ratio of concrete construction, spray cooling the warehouse surface to reduce the storage temperature of raw materials, proper control of the construction warehouse surface, as far as possible to shorten the interval between concrete layers, strengthen Quality control and a series of measures are the necessary technical measures to achieve summer high temperature construction.These measures have been proved feasible in the high temperature construction practice of RCC in Daguangba, Shibanshui and Yamaguchi hydropower stations, which is worthy of popularization and application