大化水电站是红水河梯级开发的第一期工程,于1973年开始勘测,1974年选坝,1975年5~9月完成了初步设计的审查和批准,10月正式开工。该电站位于广西都安和马山县交界的红水河上,距都安县大化公社约3公里。现将该电站工程情况简介于下。
Dahua Hydropower Station is the first phase of the development of the Hongshui River cascade. The survey was started in 1973 and the dam was selected in 1974. Preliminary design review and approval was completed from May to September 1975 and was formally started in October. The station is located on the Red River at the junction of Du’an and Mashan in Guangxi, about 3 km away from Dahua Commune in Du’an County. The power plant project is now outlined below.