论文部分内容阅读
采用寿命周期费用(LCC)法对长距离管道工程进行技术经济评价,提出了系统的目标函数和约束条件,分析了各种费用模型,并给出了算例,可供浆体长距离管道输送工程设计研究人员参考。
The LCC method is applied to evaluate the technical and economic performance of long-distance pipeline projects. The objective function and constraints of the system are proposed. Various cost models are analyzed and examples are given for long-distance pipeline transportation Engineering Design and Research Staff Reference.