新钢1号、2号高炉容积255m3,冶炼高炉锰铁。2002年2月,因7号600m3高炉炉缸突然烧穿,公司决定1号高炉转炼生铁,以弥补生铁的不足。2003年下半年,随着公司的发展和市场形势的变化,公司决定1号、2号高炉同时停炉大修,扩容改造为生铁高炉。11月31日,11月25日两炉分别停炉拆除,进行扩容改造。扩容改造工程由北京钢铁设计研究总院负责设计。计划在2004年3月底或4月初送风出铁。现将新钢锰铁高炉大修扩容改造情况做一简要介绍。
New Steel No. 1, No. 2 blast furnace capacity of 255m3, smelting blast furnace ferromanganese. In February 2002, due to the sudden burning of the hearth of No.7 600m3 blast furnace, the Company decided to convert pig iron on the 1st blast furnace to make up for the shortage of pig iron. In the second half of 2003, with the development of the company and changes in the market situation, the Company decided to stop the overhaul of No. 1 and No. 2 blast furnaces at the same time and upgrade the capacity to a pig iron blast furnace. On November 31, November 25, the two furnaces were disassembled respectively for expansion and reconstruction. Expansion renovation project by the Beijing Iron and Steel Design and Research Institute responsible for the design. It is planned that the end of March 2004 or early April blasting out. Now the new steel ferromanganese blast furnace overhaul capacity expansion to make a brief introduction.