论文部分内容阅读
安徽九成监狱管理分局自来水厂(5000m3/d)于1997年9月建成通水,采用240m3/h穿孔旋流反应斜管沉淀池,蜂窝斜管安装角度为47°,侧向进水。水源属二类湖水,每年10月—次年3月湖水浊度较高(1500~1800度),4月—9月湖水比较清澈,...
Anhui Jiucheng Prison Management Bureau Water Plant (5000m3/d) was completed in September 1997. It used a 240m3/h perforated cyclone reaction inclined pipe sedimentation tank. The installation angle of the honeycomb inclined pipe was 47°, and the water flow was lateral. The source of water belongs to the second type of lake water. The turbidity of the lake is higher (1500-1800 degrees) from October to March next year. The lake water is relatively clear from April to September....