现有移动网络的站点扩容割接为了不影响白天的日常运行,常常在夜间扩容割接。割接过程中为保证快速开通站点运行,通常夜间割接设备开通后测试工程师立刻在相应小区站点覆盖的范围内进行拨打测试,以便快速定位所割接的站点是否存在有异常问题。目前的夜间测试工作先通过手动拨打测试、手工记录测试结果及问题,而后以邮件形式上报测试数据,而检查其上报的测试结果是否属实借助于提取当月的话单进行核实。
Existing mobile network site cutover cutover in order not to affect day-to-day operations, often at night cutover expansion. In the cutover process, in order to ensure the quick operation of the site, the test engineer usually dials the test within the coverage of the corresponding cell site immediately after the opening of the night cutover device so as to quickly locate whether there is any abnormal problem in the cut site. At present, the nighttime test work first manually dials the test, manually records the test result and the problem, and then reports the test data by the mail, and checks whether the reported test result is true or not by means of extracting the phone bill of the current month for verification.