长兴泗安水库在增容的同时,为充分发挥工程的效益,通过水能计算和动能经济分析,合理确定了电站的装机容量为2×160kW
In order to give full play to the benefits of the project, the capacity expansion of Chang’an-Si’an Reservoir has been carried out. Through the calculation of hydropower energy and economic analysis of kinetic energy, the installed capacity of power station is reasonably determined to be 2 × 160kW