一、前言石臼港煤堆场部分回填了杂填土,设计要求对该种地基土进行加固,以提高基床系数和地基承载能力。我们根据杂填土的特点,决定用强夯法进
I. INTRODUCTION The Shijiu Port coal yard is partially filled with miscellaneous fill, and the design is required to reinforce such kind of foundation so as to improve the bed coefficient and foundation bearing capacity. According to the characteristics of miscellaneous fill, we decided to use aggressive ramming method