论文部分内容阅读
本文主要阐述了综采工作面设备安装的选择与设计、安装作业组织、液压支架安装等技术问题。
This paper mainly expounds the technical problems such as the selection and design of equipment installation, the installation and operation organization, the installation of hydraulic supports and so on in fully mechanized mining face.