我公司所承担监理的八一路延长线光谷大桥(庙湖段)全桥钢箱梁采用变截面连续钢箱梁,主线钢箱梁全长837m,共分为5联,2个钢箱梁匝道共计240m和9座钢桥墩共计约12000吨。施工监理过程中采取了有针对性的质量控制措施,有力地保证了钢箱梁、钢桥墩制造及安装施工质量,取得了良好的效果。
The steel box girder used in the whole bridge of Guanggu Bridge (Miahu Section) under the supervision of our company adopts the continuous steel box girder with variable cross section. The main steel box girder is 837m in length, which is divided into 5 sections and 2 steel box girder ramp A total of 240m and 9 steel piers totaling about 12,000 tons. The construction supervision process took targeted quality control measures, effectively guarantee the steel box girder, steel pier construction and installation of construction quality, and achieved good results.