论文部分内容阅读
大庆石化公司炼油厂第二污水处理场始建于1990年3月,是100万吨重油催化裂化装置配套的化工环保装置,投产于1992年10月,主要是处理工业含油污水,将其中所含有三种形式的油类即浮油、乳化油及溶解油去除,最后使得总排出水排出的油、硫、酚等各组份达到国家级废水排放标准,在来水出现波动或冲击的条件下,组份中的硫化物、氨氮偏高,通过措施的采取我们能使总排出水综合合格率达到95%以上,实现达标,获得环境效益的最大化。
Daqing Petrochemical Company Refinery Second Sewage Treatment Plant was established in March 1990, is 1000000 tons of heavy oil catalytic cracking unit supporting chemical environmental protection device, put into operation in October 1992, mainly to deal with industrial oily wastewater, which will contain Three types of oil that is, oil slick, emulsified oil and dissolved oil removal, and finally make the total discharge of water discharged from the oil, sulfur, phenol and other components to meet the state-level wastewater discharge standards, fluctuations in the incoming water or impact conditions , Components of the sulfide, ammonia nitrogen high, through the adoption of measures we can make the total discharge rate of more than 95% of the total compliance, to achieve compliance, access to environmental benefits to maximize.