论文部分内容阅读
本文作于一九八三年前后,发表于《河流辩证法与葛洲坝工程》一书中。作者根据河流学原理、河流辩证法的原则,对于兴建葛洲坝枢纽后的坝下河势进行了规划,提出了初步设想的方案和试验研究的指导思想。这几年来,葛洲坝坝下河势的演变和模型试验的成果,证明该文的初步设想和指导思想是符合实际的。为进一步总结建设葛洲坝工程的经验,本刊特转载此文并同时发表李麟祯等同志的文章。
This paper was published in the book “Dialectics of the River and Gezhouba Project” around 1983. Based on the principles of river science and river dialectics, the author plans the dam under river after the construction of Gezhouba hydropower station, and puts forward the tentative idea of tentative plan and experiment research. In recent years, the evolution of Gezhouba dam and the results of model tests prove that the preliminary ideas and guiding ideology of the article are in line with the actual conditions. In order to further summarize the experience of constructing Gezhouba project, this article specially reproduced this article and published the articles of Comrade Li Linzhen at the same time.