在实测1∶10 000水下地形资料的基础上运用不同断面间距(200、400、800、1 600和3 200m)计算了三峡水库蓄水后坝下游宜昌至枝城河段的河道冲淤量,分析了宜枝河段常测固定断面布设的合理性.研究结果表明,该研究河段布置的51个常测固定断面基本能控制地形变化,有较好的断面代表性,可不进行断面加密;河槽槽蓄量采用锥体法和梯形法计算差异很小,两种方法均能满足要求;槽蓄量计算若要达到一定的精度,在弯道、汊道、河道急剧放宽和束窄的河段断面间距不宜过大.通过比较宜枝河段不同断面间距全河段河槽冲淤量(包括枯水、平滩和洪水河槽),认为对宜枝河段而言,断面间距不大于2倍河宽即能满足精度要求.
Based on the measured 1: 10,000 underwater topographic data, the runoff and sedimentation of the Yichang-Zhicheng reach downstream of the dam after the impoundment of the Three Gorges Reservoir was calculated using the different section spacings (200, 400, 800, 1 600 and 3 200 m) , And analyzed the rationality of the regular fixed section layout in Yizhi River section.The results show that the 51 commonly measured fixed section sections arranged in the study section can basically control the terrain change and have good cross section representation without cross section encryption The difference between the calculation of the flume in the flume and the trapezoidal method is very small, and the two methods can meet the requirements. If the calculation of the flume reaches the certain accuracy, the flume The interval between the sections should not be too large.Based on the comparison of the scouring and silting volume (including the low water, the flat beach and the flood channel) of the whole river section at different sections of the Yichang section, it is considered that the interval between the sections should not be more than 2 times River width that can meet the accuracy requirements.