论文部分内容阅读
西安黄河挖掘机厂双面加工机床基础工程中,采用高掺量粉煤灰混凝土,节约水泥26.7%,有效降低了温升,全面满足了业主要求。1工程概况西安黄河挖掘机厂双面加工机床设备基础需用混凝土400m3,由英国某基础工程公司安装设计。英方要求:(1)设备基础混凝土强...
Xi’an Yellow River excavator factory in the double-sided processing machine foundation engineering, the use of high-volume fly ash concrete, saving 26.7% cement, effectively reducing the temperature rise, fully meet the requirements of the owners. 1 Project Overview Xi’an Yellow River excavator factory needs to use concrete 400m3 for the basic equipment of double-side processing machine. It is designed and installed by a basic engineering company in the United Kingdom. British requirements: (1) equipment foundation concrete strong...