论文部分内容阅读
随着我国国民经济和社会建设力度的快速发展,各种新建建筑结构不断的涌现了出来,且这些建筑结构逐渐呈现出结构复杂的形式。但是,与此同时其中存在的问题也越来越复杂和严峻,尤其是在钢筋混凝土结构施工中,由于钢筋与混凝土连接不够完善造成的工程质量隐患时有发生,不但影响了工程的施工效益,而且极容易延期严峻的施工安全事故。基于此,在目前的建筑工程项目中,工作人员常常采用剪弯力下预埋件和后锚固连接设计的方法来进行施工。本文就两者的概念以及设计特点进行了分析,并总结了其使用优势和应用效果,以供日后同行工作参考借鉴。
With the rapid development of our country’s national economy and social construction, various new building structures have been continuously emerged, and these building structures gradually show a complicated structure. However, at the same time, the existing problems are more and more complicated and harsh. Especially in the construction of reinforced concrete structures, the quality hidden dangers caused by the imperfect connection between reinforced concrete and concrete often occur, which not only affects the construction efficiency of the project, And extremely easy to postpone the serious construction safety accidents. Based on this, in the current construction projects, the staff often use the method of the embedded parts under the shear force and the post-anchorage connection design to carry out the construction. This article has carried on the analysis to both the concept as well as the design characteristic, and has summarized its use superiority and the application effect, for the future work reference for the same work.