论文部分内容阅读
几十年以来,太平洋沿岸的西北地区一直把水电作为可靠和经济的发电手段.考虑到这一情况,俄勒冈州北沃斯科县公用事业区(PUD)不仅仅建设有过鱼设施的水电工程,而且也利用现有的鱼道建设水电站.Dalles闸北岸鱼道工程于1991年投入运行.鱼道水电站工程位于美国陆军工程兵团
For decades, hydropower has been used as a reliable and economical means of power generation in the Pacific Northwest. With this in mind, PUD North Oregon Utility Area (PUD) not only builds hydropower projects that have had fish facilities but also uses existing fishways to build hydropower stations. North Shore Dalles gate fish project put into operation in 1991. YuDao Hydropower Project is located in the United States Army Corps of Engineers