论文部分内容阅读
一、概论 马尾港是福建省的重要港口,它担负着重要物资及外贸进出口物资的转运任务,建有两个万吨级、两个五千吨级泊位码头,目前年吞吐量为240万吨。 马尾港万吨码头于1970年9月动工,1974年简易投产。码头岸线长586米。由于当时码头选址处于凸岸,故码头建成后前沿水域不断淤积。1977年一、二泊位(万吨级)最小水深只有2~3米,三、四泊位(五千吨级)水深仅1.2米。1980年11月一
I. Introduction Mawei Port is an important port in Fujian Province. It undertakes the task of transporting important materials and foreign trade import and export goods. It has built two 10,000-tonnage and two 5,000-ton berths and currently has an annual throughput of 2.4 million Ton. Mawei Port 10,000 tons of docks started in September 1970, 1974 simple production. Wharf shoreline length 586 meters. Due to the location of the pier at the time, the waterfront of the pier was continuously silted up. In 1977, one or two berths (10,000-ton class) minimum depth of only 2 to 3 meters, three or four berths (five thousand-ton) water depth of only 1.2 meters. November 1980