一、前言河村水库位于浙江淳安县六都源上游,大坝为粘土心墙坝,最大坝高27.5米,正常库容290万立方米。 1958年建库时,由于事先未作必要的地质勘测工作,1961年在左坝头溢洪道浇筑施工中,左岸山体产生大滑坡,下滑量达18万立方米之巨,正在施工中的溢洪道被毁,威胁着工程及下游安全,由此引起上级领导和水利部门高度重视。经勘探查明:大坝施工时截水墙未挖到不透水岩石,左坝头与上下游长约200米的古滑坡体相接,溢洪道和涵管均设在此滑坡体
I. Preface The Kawamura Reservoir is located in the upper reaches of Liuduyuan, Chun’an County, Zhejiang Province. The dam is a clay core wall dam with a maximum height of 27.5 meters and a normal storage capacity of 2.9 million cubic meters. In 1958, due to the lack of necessary geological survey work in advance, during the construction of the left dam spillway in 1961, large landslides occurred on the left bank of the mountain with a decline of 180,000 cubic meters. The spillway under construction was destroyed , Threatening the safety of the project and the downstream, which caused the higher level leaders and water conservancy departments to attach great importance. After exploration, it was found that the water cutoff wall of the dam did not dig the impervious rock, the left dam head was connected with the ancient landslide body about 200 meters upstream and downstream, and the spillway and culvert were all located in this landslide body