沙河渡槽为黄河南控制工期的大型建筑物,为达到结构、施工、经济的最优组合,需进行多方面的方案比较。U型槽与矩形槽相比,水流条件较好,外形线条流畅、轻巧,同时U型槽为双向预应力,矩形槽为三向预应力,U槽预应力施工比矩形槽简单。从建筑工程投资看,U形槽亦优于矩形槽。从施工角度分析,架桥机预制可以减少占用河床时间,但需占用预制场地,虽费用较高,但可以保证工程质量,缩短施工工期。满堂支架施工立模支撑结构较大,对地基要求高,处理不当易引起施工挠度过大,影响结构安全。施工过程中不确定因素较多,施工质量不好保证。造槽机施工同样存在挠度问题,且需要较大的施工空间,增加工程量。
The Shahe Aqueduct is a large-scale project with a controlled construction period of the Yellow River South. To achieve the optimal combination of structure, construction and economy, a multi-faceted plan comparison is required. U-shaped groove compared with the rectangular groove, the water flow conditions are good, smooth shape lines, lightweight, while the U-shaped two-way prestressed, rectangular groove for the three-dimensional prestressed, U-groove prestressed construction simple rectangular groove. Investment from the construction point of view, U-shaped groove is also superior to the rectangular groove. From the construction point of view, bridging machine prefabricated can reduce the occupation of river bed time, but need to occupy the prefabricated site, although the cost is high, but it can ensure the quality of the project and shorten the construction period. The full support of the construction of vertical stent support structure larger, demanding on the foundation, improper handling can cause construction deflection is too large, affecting the structural safety. There are many uncertainties in the construction process and the construction quality is not guaranteed. Grooving machine construction also has the problem of deflection, and the need for a larger construction space, increase the amount of construction.