论文部分内容阅读
神朔线是西煤东运的主要通道之一,神木北站是该线主要客货运车站和编组站,2008年计划运量1.8亿t,现有行车设备和作业方式已不能满足运量日益增长和发展的需要。针对现有设备存在问题,提出增加和延长线路、改善咽喉结构、改变行车组织方式等扩能建议。
Shen-Shou Line is one of the main thoroughfares for the western coal east transportation. Shenmu North Station is the main passenger and freight station and marshalling station of this line. The planned freight volume will be 180 million tons in 2008, and the existing traffic equipment and operation methods have been unable to meet the growing demand for traffic The need for growth and development. For existing equipment problems, put forward to increase and extend the line to improve the structure of the throat to change the driving organization and other expansion proposals.