论文部分内容阅读
三门峡水利枢纽的初步设计是根据1955年8月中华人民共和国国家计划委员会所批准的计划任务书和1956年7月中华人民共和国国务院所批准的基本要点而编制的。建造三门峡水利枢纽是为了攔洪以防止游的水灾,灌溉下游平原,保证陕西、山西、河南等省
The preliminary design of the Sanmenxia Water Control Project is based on the planning tasks approved by the State Planning Commission of the People’s Republic of China in August 1955 and the basic points approved by the State Council of the People’s Republic of China in July 1956. Sanmenxia Water Control Project was built to stop floods to prevent floods, irrigation downstream plains, to ensure that Shaanxi, Shanxi, Henan and other provinces