这里介绍地下盐层内试验设施场地的通风设计。并下工程区包括二条直径3.6米的不透水竖井和长约1830米的平巷掘进,它们是用来对在盐层内临时贮存和永久堆存各种危险和非危险材料的现场试验提供通道。设计准则地下试验设施场地通风和空气处理系统的设计比传统的工业盐矿设计考虑的因素要多。为满足掘进工程和试验场地的工作要求,必须遵循如下设计准则:1.通风设计应符合加利福尼亚矿山安全规
This section introduces the ventilation design of the test facility site in the underground salt formation. The lower project area consists of two impervious shafts with a diameter of 3.6 m and a horizontal drift of about 1830 m which are used to provide access to field tests for the temporary storage and permanent storage of dangerous and non-hazardous materials within the salt layer . DESIGN GUIDELINES Underground test facility Ventilation and air handling systems are designed more than the traditional industrial salt mine design considerations. In order to meet the work requirements of tunneling works and test sites, the following design guidelines must be followed: 1. Ventilation design shall comply with California Mine Safety Regulations