论文部分内容阅读
随着堤坝建设事业的完善,黄河下游河道已经逐渐建设了至少九千多坝岸,这些坝岸保证着黄河的健康稳定和黄河两岸居民的安定生活。但是目前较为常见的现象,就是根石不足严重影响着工程安全性能。为了进一步研究黄河河道整治工程根石走失及加固情况,相关人员进行了深入探讨,并总结出根石稳定的原因、根石走失成因,最终提出相关解决措施。
With the improvement of the dyke construction, at least 9,000 dams have gradually been constructed in the lower Yellow River. These dam banks ensure the healthy and stable development of the Yellow River and the stability of the residents on both sides of the Yellow River. However, the more common phenomenon at present is that the shortage of root and stone seriously affects the engineering safety performance. In order to further study the root canal loss and reinforcement of the Yellow River river regulation project, relevant personnel conducted in-depth discussions and summarized the causes of the stability of the root stone and the cause of the root and stone loss, and finally proposed relevant solutions.