论文部分内容阅读
铁路提速的重大障碍之一是既有桥梁横向振幅超限。本文介绍了京九线小白河特大桥加固方案、施工技术和流程以及取得的成果。
One of the major obstacles to speeding up the railway is that the lateral amplitude of the existing bridge is overrun. This article introduces the reinforcement plan, construction technology and process of the Beijing-Kowloon Line Xiaobai River Bridge and the achievements made.