1、前言北京石化总厂供水干管,经过芦沟桥西道口地区,须用顶管法穿越铁路干线十余处。这一带路堤较高,又均为砂卵石,极易塌方,是这次顶管穿越面临的有待解决的课题。高复土砂石层中顶管,顶力较大,混凝土管易被挤碎。如何减小顶力是这次顶管的关键。曾在1974年春,于复兴门外西二环路,作了触变泥浆顶管试验。地层为砂质粘土,初步摸索到一些经验(见市政通讯1974年3期)。但在砂石层中,能否起减小磨阻,尚待进一步试验及实践。
1, Foreword Beijing Petrochemical Plant water mains, after Lugou Qiaoxi Xikoukou area, to be top pipe method to cross the railway line more than ten. This embankment in this area is higher, and are all gravel, easily collapse, is the pipe jacking through the unresolved issues to be solved. High composite soil gravel layer pipe jacking, large jacking, concrete pipe easily be crushed. How to reduce the jacking force is the key to jacking. In the spring of 1974, on the Second Ring Road outside Fuxingmen, a thixotropic slurry pipe jacking test was conducted. The formation of sandy clay, preliminary exploration of some experience (see municipal communications 1974 3 period). However, in the gravel layer, can reduce the friction resistance, pending further testing and practice.