本文介绍了水利水电工程网络进度计划程序的功能、特点和数学模式。这个程序由三个独立的分程序组成:1.时间参数计算;2.分段控制、调整工期;3.资源平衡优化。程序分别用A gol-60和BASIC语言编写,适用于TQ-16型电子计算机和MZ-80B微型计算机上使用。程序反映了水利水电工程的施工特点,已在几个水电工程编制网络进度时使用过,得到了满意的效果。
This paper introduces the function, characteristics and mathematical model of network schedule plan of water conservancy and hydropower project. This program consists of three separate sub-programs: 1. Time parameter calculation; 2. Segment control, adjust the duration; 3. Resource balance optimization. The programs are written in A gol-60 and BASIC languages respectively and are suitable for use on TQ-16 computers and MZ-80B microcomputers. The program reflects the construction characteristics of water conservancy and hydropower projects and has been used in the preparation of several network progress of hydropower projects with satisfactory results.