五强溪水电站位于湖南省沅陵县境内,装机容量1200MW,以发电为主,兼有防洪、航运等综合效益。长江葛洲坝工程局受五强溪建设公司(业主)委托,于1990年10月组建工程监理部负责土建工程的施工监理,主要承担除永久船闸以外的全部主体工程的混凝土施工、基础处理、仪器埋设、安全监测、建筑装修等施工监理任务,累计监理混凝土施工230多万 m~3,基础固结与帷幕灌浆13万多 m,建筑装修面积5万多 m~2。
Wuqiangxi Hydropower Station is located in Yuanling County, Hunan Province, with an installed capacity of 1,200MW, mainly generating electricity with the combined benefits of flood control and shipping. Commissioned by Wuqiangxi Construction Company (owner), the Gezhouba Engineering Bureau of the Yangtze River was commissioned by the Construction Supervision Department in October 1990 to undertake the construction supervision of the civil works and mainly undertake the concrete construction, foundation treatment and equipment burial of all the main works except the permanent ship lock , Safety monitoring, building decoration and other construction supervision tasks. The accumulated supervision of concrete construction is over 2.3 million m 3, the foundation consolidation and curtain grouting are more than 130,000 m, and the building decoration area is more than 50,000 m 2.