梅山冶金公司高炉出铁场除尘工程由马鞍山钢铁设计研究院设计,于1986年1月建成.经一年多的生产实践证明,除尘效果显著,铁水罐子台周围没有粉尘外溢现象,炉前操作室的岗位粉尘浓度由原来的40mg/m~3降到平均7.32mg/m~3,低于国家的规定标准. 该系统与国内外的同类型高炉的出铁场除尘系统相比,具有投资省(约省240余万万元)、占地少(少占800m~2)、电耗低
Meishan Metallurgical Company Blast Furnace Dust Removal Project designed by the Ma On Shan Iron and Steel Design and Research Institute, completed in January 1986. After more than a year of production practice has proved that the dust removal effect is significant, there is no dust spillage around the tank table, furnace front operating room Of the post dust concentration from the original 40mg / m ~ 3 down to an average of 7.32mg / m ~ 3, lower than the national standard.The system with the same type of blast furnace at home and abroad than the dust removal system, with the investment province (About 240 million yuan about the province), covers an area of ?? less (accounting for 800m ~ 2 less), low power consumption