论文部分内容阅读
水电工程实施之前的可行性研究阶段对工程造价的合理性和准确性提出了更高的要求,该阶段要把握好工程造价的总盘子,为项目决策提供可靠的依据。根据水电建设工程项目的特点和设计院在水电工程造价管理领域的地位和作用,提出设计院要转变观念,正确处理技术先进与经济合理两者之间的关系,合理确定和有效控制工程造价;实行设计咨询制度;进行多种设计方案比较,对水电工程造价实行动态控制和管理等措施,以控制可行性研究阶段水电工程造价。
The feasibility study stage prior to the implementation of hydropower projects put forward higher requirements on the rationality and accuracy of project cost. At this stage, we should grasp the general plate of project cost and provide a reliable basis for project decision-making. According to the characteristics of hydropower construction project and the status and function of Design Institute in the field of hydropower project cost management, it is proposed that design institute should change the concept, correctly handle the relationship between advanced technology and economic rationality, reasonably determine and effectively control project cost; Implementation of the design and consulting system; a variety of design options, the implementation of dynamic control and management of hydropower projects and other measures to control the feasibility study stage hydropower project cost.