论文部分内容阅读
在松散土层或含水岩层裂隙中采取注浆工法能够固结土颗粒或充塞岩层裂隙以获得土(岩)层力学性质改善而满足设计要求的土层加固,是岩土工程施工的一项重要工作。注浆施工前的现场调查、试验、设计及施工及注浆效果确认是注浆工法的五个重要的环节;施工前对现场充分调查及对调查结果的准确分析研讨对能够保障注浆施工的合理有效,同时对降低事故发生率及事故处理所花费的大量时间和费用至关重要。
The grouting method in loose soil or water-bearing rock fractures can consolidate soil particles or stuffed rock fissures to obtain soil reinforcement with improved mechanical properties of soil layers to meet the design requirements, which is an important issue in geotechnical engineering jobs. Site investigation, test, design and construction before grouting construction and grouting effect confirmation are five important aspects of grouting method; full investigation on the site before construction and accurate analysis of the survey results to ensure that the grouting construction Reasonable and effective, at the same time to reduce the incidence of accidents and the time and cost of dealing with the accident is essential.