论文部分内容阅读
第三次治淮治太工作会议后,治淮基建工作进入全面攻坚阶段,项目多,任务重,时间紧,线长点多。这些在建工程能否安全渡汛,提早发挥效益,对治淮攻坚战将起十分重要的作用。 淮委于1月中旬和3月下旬先后召开了1994年度工作会议和第一次防汛工作会议,委领导对在建工程渡汛提出了明确要求。会后我委发出了淮委基[1994]13号文“关于做好在建工程1994年渡汛工作的通知”,对在建工程渡汛工作做了统一布署和安排。经过各方面几个
The third Huaiji governance work meeting too much, the Huai River infrastructure construction work has entered a comprehensive stage of tackling the problem, many projects, heavy tasks, time is tight, long points and more. Whether these projects under construction can flood safely and bring benefits earlier will play a very important role in tackling the tough battle of the Huai River. Huai appoint in mid-January and late March has held a 1994 annual work conference and the first meeting of flood control work, the leadership of the Committee on the construction of flood relief project made a clear request. After the meeting, I issued a letter Huaiheiji [1994] No. 13, “Notice on Doing Flood-Drainage Work in Progress of Construction in 1994”, and made arrangements and arrangements for the flood control work under construction in a unified way. After a few in all aspects