笑迎“二梅”跨入新时代

来源 :园林 | 被引量 : 0次 | 上传用户:yinqing68
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
2001年2月17日至3月15日,无锡市政府与中国花卉协会梅花蜡梅分会主办、无锡市园林局与所属梅园承办的全国第七届梅花、蜡梅展,将在以梅为市花之一的江南风景名城无锡举行,无锡市首届梅花节也同期举办。梅展期间,穿插召开两个国际会议,“国际梅花蜡梅文化研讨会”和“梅国际登录第二届年会”。这一系列的“二梅”活动,是在世纪之交开展的。它标志着“二 February 17, 2001 to March 15, 2001, the Wuxi Municipal Government and China Association of flowers plum wax plum branch, Wuxi City Gardens Bureau and the associated plum Park hosted the seventh plum, wax plum exhibition, will be in the plum for One of the flowers of the famous scenic city of Wuxi held in Wuxi, Wuxi City, the first Plum Festival also held the same period. During the exhibition, two international conferences were held interspersed with “Symposium on International Plum Blossom and Plum Blossom” and “Symposium on International Login”. This series of “two plum” activities were carried out at the turn of the century. It marks "two
其他文献
随着城镇化进程的加快,我国重要基础设施建设取得了显著的成效.城市的所有基础设施中雨污水排水管道系统占据了重要地位,对人们的日常生活存在直接的影响.排水管道建设工程在
分析了路面产生病害的原因,结合工程实例,道路病害调查不仅应该使用常规的道路现状检测方法,而且要结合大管径雨污水管道破损情况进行路况现状综合调查,采取有针对性的措施,
现如今,我国的经济在快速发展,社会在不断进步,在桥梁检测工作中,静载试验作为一种常见的方式,能够为桥梁结构承载能力以及使用状态判断带来帮助,为人员提供相应的依据,使桥
跨既有铁路的桥梁施工采用转体法,将在有列车运行的上空施工作业转化为邻近铁路的作业,减小了对铁路交通的干扰.依托G207线跨邯长铁路T构桥,分析了箱梁支架现浇施工的危险源,
公路工程是一项长期、复杂的工程项目,涉及多方利益,具有建设周期长、施工工序多、风险因素大等特点,对公路工程建设管理目标的实现带来了一定难度.在公路工程建设中实施工程