论文部分内容阅读
据水利水电规划设计总院所编《中国大中型水电站规划图集》,新统计全国可开发大中型水电站(装机容量2.5万 kW 以上)有1360.5座(有些位于国际边界河流上的水电站各计0.5),总计装机容量40463万 kW,比过去普查统计的3.78亿 kW(包括部分小水电在内)有所增加。新统计可开发大中型水电站中,装机容量100万 kW 以上的大型水电站有87.5座,共计25797万 kW,占63.7%;装机容量25~100万kW 的大型水电站137.5座,共计7688万 kW,
According to the Planning Atlas of China’s Large and Medium-sized Hydropower Stations compiled by the General Planning and Design Institute of Water Conservancy and Hydropower, there are 1360.5 new hydropower stations in the country that can be developed large and medium-sized hydropower stations (with an installed capacity of 25,000 kW or above) (some hydropower stations on international border rivers have a total of 0.5 ), With a total installed capacity of 404.63 million kW, an increase of 378 million kW (including some small hydropower) from the previous census. Among the new large and medium-sized hydropower stations, 87.5 large-scale hydropower stations with installed capacity of over 1 million kW account for a total of 257.97 million kW, accounting for 63.7%; 137.5 large hydropower stations with a installed capacity of 25-100 million kW, for a total of 76.88 million kW,