论文部分内容阅读
辽宁省肿瘤医院病房楼工程为地下二层、地上十五层的高层建筑,占地面积为780平方米,建筑面积为15860平方米。全部建筑装修工程机具材料的垂直运输总量达11000余吨。在施工中,利用三个电梯井制作了二个载重1吨的小吊笼和一个便于运送长大物件的双门大吊笼,解决了垂直运输总量的60%。在保证运输急需、加快工程进度、实现现场文明施工和节约施工费用等方面,都收到了较好的技术经济效果。现代高层建筑的电梯井,大多作为抗震的简体结构,做成整体现
Liaoning Province Tumor Hospital Ward Building Project is a two-story underground and fifteen-storey high-rise building with an area of 780 square meters and a building area of 15,860 square meters. The total amount of vertical transport of construction materials for all construction and renovation projects reached more than 11,000 tons. In the construction, two small hoist cages with a load of 1 ton and two double-door cages for transporting large and small objects were produced using three elevator shafts, which solved 60% of the total vertical transport volume. In terms of ensuring urgent transportation needs, accelerating project progress, realizing on-site civilized construction, and saving construction costs, they all received good technical and economic results. Elevator shafts in modern high-rise buildings are mostly used as simplified structures for earthquake resistance.