荆襄大峪口矿是国家“八五”重点建设项目,建设规模采选各150万吨/年,还有硫酸、磷酸、重钙、氟化铝等矿肥结合工程,总投资约14亿元。大峪口项目施工用电平均为5000kVA变压器,而且建在新的选厂厂址上,必须搬迁。若另建临时变电所,约需投资200万元,显然不经济。工程指挥部经与化工矿山设计院有关人员多次研究、踏勘、计算比较,确定首先兴建采选35kV变电所。方案确定后,仅用两个月时间就完成了施
Jingxiang Dayukou Mine is a national key project of the “Eighth Five-Year Plan”, with a construction scale of 1.5 million tons / year and a combined project of mineral and fertilizer such as sulfuric acid, phosphoric acid, heavy calcium and aluminum fluoride with a total investment of about 1.4 billion yuan. Dayukou project construction electricity average of 5000kVA transformer, and built in the new dressing plant site, you must relocate. If another temporary substation, about 2000000 yuan investment, obviously not economical. Engineering Command and Chemical Mining Design Institute by the relevant personnel on many occasions, reconnaissance, calculation and comparison, to determine the first construction of mining 35kV substation. Once the plan is finalized, it will take only two months to complete