一、工程概况 1957—1958年喷气式飞机的迅速发展急需改造费城国际机场,以适应喷气机航行业务。改造主要项目是延伸原有跑道、即新增2300英尺跑道以及相应的设施。原机场竣工于三十年代,建在邻近淤填的沼泽边缘地界。该地区部分被特拉华河的潮水淹没,部分为河道疏浚排泥区。1949—1950年机场扩建到潮漫滩,该处土壤为深厚的淤泥层和
First, the project overview The rapid development of jet aircraft from 1957 to 1958 urgently needed to transform Philadelphia International Airport to adapt to the jet navigation business. The main project is to extend the original runway, the new 2,300-foot runway and the corresponding facilities. The original airport was completed in the 1930s and was built on the fringe of a marsh adjacent to the silt. Part of the area is submerged by the tides of the Delaware River, partly as dredged muddy areas. From 1949 to 1950, the airport was expanded to flood flood plain where the soil is deep silt and soil